FPSO offers cost effective solution for the development of marginal fields with short production life span on remotely located fields isolated from existing infrastructure. As an early production system, this concept also provides quality data for a better understanding of the complex reservoir thus reducing the risk for full field development in addition to providing productions operation experiences and early revenue to the field owner.

Vessels:

 

  Armada Perdana
  Technical Specification
 
Conversion Shipyard Keppel Shipyard, Tuas, Singapore
Delivery August 2009
Mooring System 12 point spread mooring (3 lines x 4 clusters)
Location Oyo Field
Client Nigeria Agip Exploration Limited (NAE)
Accommodation 75 pax
Helideck Super Puma AS332-L2
Length Overall 308.735 m
LBP 283.00 m
Moulded Breadth 46.00 m
Moulded Depth 22.55 m
Draft (Summer) 17.40 m
Lightship 34,326 T
Deadweight 156,483 T
Gross Tonnage 84,065
Net Tonnage 60,261
Cargo Capacity 1,106,000  barrels (at 98% capacity)
Liquid Handling 45,000 blpd
Oil Handling 40,000 bopd
HP Gas Compression 66 MMscfd @ 225 barg discharge
Flash Gas Compression 2.4 MMscfd
Produced Water System 9,000 bwpd max
Seawater Injection 15,000 bwpd @ 217 barg
Photo

Armada Perdana

 

 
 

 


 

  Armada Perkasa
  Technical Specification
 
Official No 328002
Port of Registry Panama
Call Sign 3EOES IMO No. 7383401
Conversion 1997 Keppel Shipyard
Builder Hull No : 203
Year Built / Completion 1975
Classification American Bureau Of Shipping
Flag Malaysian
Mooring System 10 point spread mooring
Length Overall 211.18 m
Deadweight 58,557 T
Cargo Capacity 298,357 bbls
Aux Power Generator 3 x 690 kW Sulzer/NEBB(diesel driven), 450V AC, 3-phase, 60Hz
Main Generator 2 MW diesel driven
Liquid Handling 27,000 blpd
Oil Handling 20,000 bopd
Gas Handling 20 MMscfd continuous
Water Handling 20,000 bwpd max
Crude Quality 10 psi RVP @ 0.5% BS&W
Gas Lift Compression 2 x 50%, 9 MMscfd per train
Fuel Gas System 1.5 MMscfd
Pig Receivers Test & Production Lines
Crude Separation First Stage Separator, Second Stage Separator and Test Separator
Crude Heating Preheater and interstage heater in parallel
Dehydration Electrostatic Dehydrator
Photo Armada Perkasa


The Armada Perkasa is the first ever FPSO in Malaysia. Today, it has found a home in the Nigerian waters. It is currently undergoing upgrading and conversion to suit the requirements for the Okoro Setu Field Development for Afren. It is set to sail away on charter in the fourth quarter of this year for a fixed five years.

 

Achievements during previous conversion:

Life Extension & Modifications: 90 days
Process Plants (7 Skids): 90 days
Fiscal Metering: 120 days
Helideck: 45 days
Hook Up Process Plant: 30 days
Field Installation: 17 days


 

For further information, you may contact:

Mr Andrew Lamshed
Level 21, Menara Perak,
24, Jalan Perak,
50450 Kuala Lumpur, Malaysia
Tel: 03-2171 5799
Fax: 603-2163 5799
Email: fpso@bumiarmada.com

 

 
 

   
Sitemap | Terms & Conditions
© 2007 Bumi Armada. All Rights Reserved.