Bumi Armada’s Transport and Installation experience is summarised below:


Te Giac Trang, Viet Nam, Client: HLJOC (on going project), 43m water depth:

  • Preset of the FPSO 12 point mooring system (anchor piles, ground chain, excursion limiter chains and top chains),
  • Mid water arch jacket installation (1000Te structures in two parts, with the base piled and the jacket and gutter structure installed over the base with grouting operation)
  • Riser bottom guide frame (30Te skirted subsea structure),
  • FPSO tow from Keppel shipyard to location – Vietnam
  • FPSO hook up
  • Flexible risers system (7 off flexible risers) installation including tie-ins to the PLEM (scheduled in 2011)
  • Leak testing of the flexible risers from the FPSO
  • Installation of the dynamic umbilical from FPSO to PLEM
  • Installation of the export hose


Oyo Field, Nigeria, Client: ENI - Nigeria Agip Exploration Limited (NAE), (Perdana FPSO), 380m water depth.

  • Preset of the mooring (12 point spread mooring - 3 lines x 4 clusters, Stevpris anchors, ground chains, spiral strand wires and top chains)
  • FPSO transit from Keppel shipyard to location – Nigeria
  • FPSO hook up to its mooring
  • The mooring preset was done using the Normand Installer.


Okoro Setu field, Nigeria, Client: Afren (Armada Perkasa FPSO):

  • FPSO transit from Keppel shipyard to location (Nigeria)
  • Preset of the mooring (10 point spread mooring)
  • FPSO hook up to its mooring
  • Flexible riser system installation
  • Installation of the export hose